Multi-Site Bus Stop Solution
Oil & GasLeading midstream natural gas service provider specializing in pipeline infrastructure
Challenge
- Provide secure, weather-proof housing for remote control system components
- Require small footprint covered, outdoor equipment rack (bus stop style) for remote site control and monitoring
- Need solution for sites without utility electrical service
- Require reliable control and monitoring of main line block valves, pressure, flow, and temperature on oil and natural gas pipelines
Solution Delivered
Hardware Components
- Multiple control panels for 20 bus stops (3 Solar-powered, 9 480VAC, 8 240VAC)
- Low-profile design (60" high) for locations with irrigation systems
- Solar power systems for remote locations
- Radio and fiber optic communication systems
Implementation Services
- Project management
- Design and engineering
- Fabrication
- PLC/HMI configuration
- System integration
- Documentation development
- Installation coordination
- Commissioning and startup
Key Functionalities
- Remote monitoring and control capabilities
- Integrated communications systems
- Uninterrupted operations in areas without utility service
- Compatible with rotating irrigation systems
- Environmental protection for sensitive equipment
Results
Immediate Outcomes
- Achieved on-time delivery and startup for all sites
- Successfully implemented all control parameters
- Established reliable remote monitoring capabilities
Expansion Status
- Received additional bus stop orders based on project success
- Expanded to include solar-powered instrument stands
- Implemented at multiple locations across the pipeline network
Business Impact
- Enhanced operational control and monitoring capabilities
- Improved maintenance efficiency
- Reduced reliance on utility infrastructure
- Increased system reliability and uptime
View More Spotlights
Contact Us
If you’d like to talk to us about how we can help support or enhance your operational capabilities, please contact us!

